With 27 years of airport experience, Latersolo stands out with its expertise in Executive Airport Infrastructure

Projects:

  • Passenger terminal;
  • R / D tracks and taxiway;
  • Horizontal and vertical signs;
  • Design of floors;
  • Safety and economic viability;
  • Audits, Inspections, Evaluations;
  • Construction Management and Inspection;
  • Technological and Quality Control;
  • Project Quality Control (CQP);
  • Basic Plan of the Aerodrome Protection Zone;
  • Diagnostic test and pavement restoration project.

Among its clients are:

  • GRU Airport
  • OAS
  • EMBRAER
  • Prefeitura Municipal de Limeira
  • Prefeitura Municipal de Araras
  • Mineração Rio do Norte -MRN
  • Fidens Engenharia
  • Estado do Rio Grande do Sul
  • Construtora Sucesso

 

 

Main projects:

 

GRU AIRPORT – AEROPORTO INTERNACIONAL DE GUARULHOS

Aeroporto Internacional de Guarulhos, São Paulo. Brasil. 2013-2017

  • Objective assessment of the rigid pavement of aircraft parking yards;
  • Rigid pavement restoration project for aircraft parking yards;
  • Technological control and supervision of the track system restoration work;
  • Survey of Longitudinal and Transversal Surface Runway Irregularity (IRI);
  • Pavement Diagnostic Test and Runway Recovery Project.

 

OAS – AEROPORTO INTERNACIONAL DE GUARULHOS

GRU AIRPORT – Aeroporto Internacional de Guarulhos, São Paulo. Brasil. 2014

  • Runway Project Quality Certification (CQP) – PRA – taxiway
  • Project Quality Certification (CQP) for access to the Fire Station and Project Changes;

 

EMBRAER – GAVIÃO PEIXOTO AERODROME

Gavião Peixoto Aerodrome, Gavião Peixoto. Brasil. 2016

  • Technological control and supervision of the runway resurfacing work.

 

LIMEIRA CITY HALL

International Limeira Airport, São Paulo. Brasil. 2010-2012

Architecture:

  • Masterplan airport zone;
  • Passenger terminal for 3mi pax;
  • Heliport;
  • Control tower;
  • Fire fighting session;
  • Pedestrian access guardhouse;
  • Vehicle parking;

Engineer:

  • Executive project of horizontal signaling of the runway system;
  • Executive project of light and vertical signaling of the runway system;
  • Executive geometric design of the aircraft yard;
  • Management of geotechnical study and laboratory testing of works
  • Design of pavement and drainage of the R / D track and taxiways of 3800 m PCN = 61 / F / D / W / T-PML
  • Runway and taxiway executive geometric design (3600m x 45m for B 767-400 aircraft);
  • Runway and taxiway executive geometric design (3800m x 45m for B 767-400 aircraft);

Infrastructure

  • Road project of intersection with SP 147;
  • Basic project of implementation of Centro-Limeira railroad.

 

ARARAS CITY HALL

Armando Américo Fachini Municipal Airport, Araras. São Paulo. 2014-2015

Architecture

  • Passenger terminal basic Project;

Engineer

  • Geometric readjustment of the L / R runway system to expand the Armando Américo Fachini Municipal Airport;
  • Basic Plan of the Aerodrome Protection Zone.

 

FIDENS ENGENHARIA

1) International Airport of Catoca in Saurimo, Angola. 2009-2011

Architecture

  • Executive project of the passenger terminal for 1mi pax.

Engenharia

  • Runway Executive Geometric Design (2420m x 30m);
  • Runway Executive Floor Design PCN = 46 / F / B / W / T (2420m x 30m);
  • Runway Executive Runway Project PCN = 46 / F / B / W / T (2420m x 30m);
  • Executive geometric design of the aircraft maneuvering yard;
  • Executive drainage project of the courtyards and runways system;
  • Project of horizontal / vertical executive signaling of the courtyards and lanes system;
  • Technological control and management of paving system of patios and lanes.

 

MRN MINERAÇÃO RIO DO NORTE

Porto Trombetas Airport, Pará. Brasil. 2012

  • Executive design of geometric readjustment of the aircraft runway and patio system;
  • Executive design of horizontal and vertical signaling of the aircraft runway and patio system;
  • Runway extension project for B737-800 aircraft;
  • Executive project to expand the aircraft parking lot to meet EMB 190/195 and B 737-800;
  • Executive project for the restoration of the aircraft runway and pavement system

 

MARCILIO ENGENHARIA

1) 1) Aeródromo Fazenda Caraibas, Mato Grosso do Sul. Brasil

  • Executive geometric design of the runway and aircraft yard;

2) Aeroporto de Macaé, Rio de Janeiro. Brasil. 2010

  • Review of the runway, taxiway and aircraft courtyards design;

 

USIMINAS

Prata Aerodrome, Minas Gerais. Brasil. 2010

  • Runway and aircraft patio executive project;

 

FERREIRA CONSULTING

1) Ipatinga Airport, Minas Gerais. Brasil. 2010-2011

  • Runway, taxiway and aircraft courtyards design;

2) USIMINAS Airport, Minas Gerais. Brasil. 2009

  • Design of the executive pavement of the airstrip, taxiway and aircraft parking lot.

 

GOVERNMENT OF RIO GRANDE DO SUL STATE

PELT – Plano Estadual de Logística e Transportes. 2014

  • Preparation of the Rio Grande do Sul state air plan for the next 25 years;

SUCESSO CONSTRUCTION COMPANY

São Raimundo Nonato Airport – PI

  • Evaluation of the Operational Conditions of the São Raimundo Nonato – PI Airport Pavement

Leave a comment